Go Solar in Kolkata

Your ultimate guide to switching to green energy in Kolkata. Calculate your costs, understand local subsidies, and check your ROI.

☀️ 4.5 Peak Sun Hours/day 🏢 DISCOM: CESC 💰 Subsidy up to ₹78,000 ⚡ Payback: ~3.3 years

Top Tools for Kolkata Residents

💰
Cost Calculator
Check Kolkata market rates for 1kW - 10kW setups.
🎁
Subsidy Check
See your eligible PM Surya Ghar funds instantly.
📈
ROI Calculator
Discover your payback period in Kolkata.

Solar Energy in Kolkata: Complete 2026 Guide

Kolkata, the City of Joy, has lower irradiance (4.5 hrs) due to monsoon humidity, but its high CESC tariff (₹7.50/unit) still ensures a solid 5–6 year solar payback. Several Salt Lake and New Town housing societies have already gone solar. With electricity tariffs charged by CESC at ₹7.50/unit and rising every year, switching to rooftop solar is now the single best financial decision a Kolkata household can make in 2026.

Solar Potential: How Much Can You Generate in Kolkata?

Kolkata receives approximately 4.5 peak sun hours per day (based on MNRE solar radiation data for this region). This means every 1 kW of rooftop solar installed here generates about 1,387 units of electricity per year.

For a typical 3 kW system — the most popular size for a 2–3 BHK home — you can expect:

PM Surya Ghar Subsidy for Kolkata Residents

Residents of Kolkata in West Bengal are fully eligible for the PM Surya Ghar Muft Bijli Yojana. The central government provides a Direct Benefit Transfer (DBT) subsidy directly to your bank account:

State subsidy note: No West Bengal state top-up. Central PM Surya Ghar applies.

Cost & Savings Table — Kolkata (2026)

System Size Gross Cost Subsidy Net Cost Annual Generation Monthly Savings Payback
1 kW ₹60,000 ₹30,000 ₹30,000 ~1,387 units ₹855/month 2.9 yrs
2 kW ₹120,000 ₹60,000 ₹60,000 ~2,774 units ₹1,710/month 2.9 yrs
3 kW ₹180,000 ₹78,000 ₹102,000 ~4,161 units ₹2,565/month 3.3 yrs
5 kW ₹300,000 ₹78,000 ₹222,000 ~6,935 units ₹4,275/month 4.3 yrs
10 kW ₹600,000 ₹78,000 ₹522,000 ~13,870 units ₹8,550/month 5.1 yrs

* Costs are indicative estimates for Kolkata as of 2026. Actual prices vary by brand (Waaree, Adani, Tata, Vikram). Savings calculated at ₹7.50/unit tariff. Use our cost calculator for personalised estimates.

Your DISCOM: CESC

In Kolkata, electricity distribution and net metering for rooftop solar is managed by CESC (Calcutta Electric Supply Corporation) for Kolkata/Howrah/Hooghly; WBSEDCL for outer areas. Here's what you need to know about solar net metering under CESC:

Step-by-Step: How to Get Solar in Kolkata

  1. Check your eligibility: Use our Subsidy Calculator to see the exact PM Surya Ghar amount for your home's load and West Bengal location.
  2. Size your system: Use the Panel Requirement Calculator — enter your monthly bill in units. Most Kolkata households need a 2–4 kW system.
  3. Register on the National Portal: Go to pmsuryaghar.gov.in, register with your Aadhaar and CESC consumer number.
  4. Choose an MNRE-empanelled installer from the portal's vendor list — do not use non-empanelled vendors as your subsidy will be blocked.
  5. Get installation done: Typical completion time in Kolkata: 2–4 days for a residential system.
  6. Submit inspection documents to CESC for net meter installation (usually within 15–30 days).
  7. Receive subsidy: DBT credit directly to your bank account within 30 days of net meter commissioning.

Solar ROI Analysis for Kolkata

Here's a quick back-of-envelope calculation for a typical Kolkata household:

Want the exact numbers for your home? Use our Solar ROI Calculator and Solar Loan EMI Calculator if you're considering financing.

Nearby Cities Also Exploring Solar

If you found this guide useful, also check our guides for nearby cities: Asansol, Maheshtala, Patna — each with city-specific DISCOM, tariff, and cost data.

For state-level subsidy policy in West Bengal, see our West Bengal Solar Calculator.

Frequently Asked Questions — Solar in Kolkata

Which DISCOM handles solar in Kolkata?

CESC handles all grid connections, net metering applications, and billing in Kolkata. Contact your nearest sub-division office or visit the DISCOM's official portal to apply for net metering after installation.

How many peak sun hours does Kolkata get per day?

Kolkata receives approximately 4.5 peak sun hours per day (annual average based on MNRE solar radiation data). This determines how much electricity your solar panels generate — every 1 kW of installed capacity generates roughly 1314 units per year.

How much does a 3kW solar system cost in Kolkata after subsidy?

A 3kW on-grid solar system in Kolkata typically costs ₹1.65–1.95 lakh gross. After the PM Surya Ghar central subsidy of ₹78,000, the effective cost is approximately ₹87,000–₹1.17 lakh. With 4.5 PSH/day, payback is around 3.3 years.

What is the PM Surya Ghar subsidy process in Kolkata?

1) Register at pmsuryaghar.gov.in with your CESC consumer number and Aadhaar. 2) Get feasibility approval (7–15 days). 3) Install via MNRE-empaneled vendor. 4) CESC installs bi-directional smart meter after inspection. 5) Subsidy of up to ₹78,000 credited to your bank account within 30 days of commissioning.