Go Solar in Surat

Your ultimate guide to switching to green energy in Surat. Calculate your costs, understand local subsidies, and check your ROI.

☀️ 5.6 Peak Sun Hours/day 🏢 DISCOM: DGVCL 💰 Subsidy up to ₹78,000 ⚡ Payback: ~3.5 years

Top Tools for Surat Residents

💰
Cost Calculator
Check Surat market rates for 1kW - 10kW setups.
🎁
Subsidy Check
See your eligible PM Surya Ghar funds instantly.
📈
ROI Calculator
Discover your payback period in Surat.

Solar Energy in Surat: Complete 2026 Guide

Surat is India's diamond polishing capital and one of the fastest-growing cities in the world. Its textile units and diamond units run in large flat-roofed industrial sheds — perfect for MW-scale solar. With electricity tariffs charged by DGVCL at ₹5.80/unit and rising every year, switching to rooftop solar is now the single best financial decision a Surat household can make in 2026.

Solar Potential: How Much Can You Generate in Surat?

Surat receives approximately 5.6 peak sun hours per day (based on MNRE solar radiation data for this region). This means every 1 kW of rooftop solar installed here generates about 1,716 units of electricity per year.

For a typical 3 kW system — the most popular size for a 2–3 BHK home — you can expect:

PM Surya Ghar Subsidy for Surat Residents

Residents of Surat in Gujarat are fully eligible for the PM Surya Ghar Muft Bijli Yojana. The central government provides a Direct Benefit Transfer (DBT) subsidy directly to your bank account:

State subsidy note: Gujarat offers ₹10,000/kW state subsidy (up to 3 kW) via GEDA on top of PM Surya Ghar.

Cost & Savings Table — Surat (2026)

System Size Gross Cost Subsidy Net Cost Annual Generation Monthly Savings Payback
1 kW ₹60,000 ₹30,000 ₹30,000 ~1,716 units ₹818/month 3.1 yrs
2 kW ₹120,000 ₹60,000 ₹60,000 ~3,431 units ₹1,636/month 3.1 yrs
3 kW ₹180,000 ₹78,000 ₹102,000 ~5,147 units ₹2,453/month 3.5 yrs
5 kW ₹300,000 ₹78,000 ₹222,000 ~8,578 units ₹4,089/month 4.5 yrs
10 kW ₹600,000 ₹78,000 ₹522,000 ~17,155 units ₹8,178/month 5.3 yrs

* Costs are indicative estimates for Surat as of 2026. Actual prices vary by brand (Waaree, Adani, Tata, Vikram). Savings calculated at ₹5.80/unit tariff. Use our cost calculator for personalised estimates.

Your DISCOM: DGVCL

In Surat, electricity distribution and net metering for rooftop solar is managed by DGVCL (Dakshin Gujarat Vij Company) / Surat Municipal Area: DGVCL. Here's what you need to know about solar net metering under DGVCL:

Step-by-Step: How to Get Solar in Surat

  1. Check your eligibility: Use our Subsidy Calculator to see the exact PM Surya Ghar amount for your home's load and Gujarat location.
  2. Size your system: Use the Panel Requirement Calculator — enter your monthly bill in units. Most Surat households need a 2–4 kW system.
  3. Register on the National Portal: Go to pmsuryaghar.gov.in, register with your Aadhaar and DGVCL consumer number.
  4. Choose an MNRE-empanelled installer from the portal's vendor list — do not use non-empanelled vendors as your subsidy will be blocked.
  5. Get installation done: Typical completion time in Surat: 2–4 days for a residential system.
  6. Submit inspection documents to DGVCL for net meter installation (usually within 15–30 days).
  7. Receive subsidy: DBT credit directly to your bank account within 30 days of net meter commissioning.

Solar ROI Analysis for Surat

Here's a quick back-of-envelope calculation for a typical Surat household:

Want the exact numbers for your home? Use our Solar ROI Calculator and Solar Loan EMI Calculator if you're considering financing.

Nearby Cities Also Exploring Solar

If you found this guide useful, also check our guides for nearby cities: Ahmedabad, Vadodara, Rajkot — each with city-specific DISCOM, tariff, and cost data.

For state-level subsidy policy in Gujarat, see our Gujarat Solar Calculator.

Frequently Asked Questions — Solar in Surat

Which DISCOM handles solar in Surat?

DGVCL handles all grid connections, net metering applications, and billing in Surat. Contact your nearest sub-division office or visit the DISCOM's official portal to apply for net metering after installation.

How many peak sun hours does Surat get per day?

Surat receives approximately 5.6 peak sun hours per day (annual average based on MNRE solar radiation data). This determines how much electricity your solar panels generate — every 1 kW of installed capacity generates roughly 1635 units per year.

How much does a 3kW solar system cost in Surat after subsidy?

A 3kW on-grid solar system in Surat typically costs ₹1.65–1.95 lakh gross. After the PM Surya Ghar central subsidy of ₹78,000, the effective cost is approximately ₹87,000–₹1.17 lakh. With 5.6 PSH/day, payback is around 3.5 years.

What is the PM Surya Ghar subsidy process in Surat?

1) Register at pmsuryaghar.gov.in with your DGVCL consumer number and Aadhaar. 2) Get feasibility approval (7–15 days). 3) Install via MNRE-empaneled vendor. 4) DGVCL installs bi-directional smart meter after inspection. 5) Subsidy of up to ₹78,000 credited to your bank account within 30 days of commissioning.