Your ultimate guide to switching to green energy in Guwahati. Calculate your costs, understand local subsidies, and check your ROI.

☀️ 4.2 Peak Sun Hours/day 🏢 DISCOM: APDCL 💰 Subsidy up to ₹78,000 ⚡ Payback: ~4.4 years

Top Tools for Guwahati Residents

💰
Cost Calculator
Check Guwahati market rates for 1kW - 10kW setups.
🎁
Subsidy Check
See your eligible PM Surya Ghar funds instantly.
📈
ROI Calculator
Discover your payback period in Guwahati.

Solar Energy in Guwahati: Complete 2026 Guide

Guwahati is Northeast India's largest city and gateway to the Seven Sisters. Despite lower irradiance (4.2 hrs/day due to heavy monsoons), Assam's additional state subsidy and high tariff still give a reasonable 6–7 year payback. With electricity tariffs charged by APDCL at ₹6.20/unit and rising every year, switching to rooftop solar is now the single best financial decision a Guwahati household can make in 2026.

Solar Potential: How Much Can You Generate in Guwahati?

Guwahati receives approximately 4.2 peak sun hours per day (based on MNRE solar radiation data for this region). This means every 1 kW of rooftop solar installed here generates about 1,278 units of electricity per year.

For a typical 3 kW system — the most popular size for a 2–3 BHK home — you can expect:

PM Surya Ghar Subsidy for Guwahati Residents

Residents of Guwahati in Assam are fully eligible for the PM Surya Ghar Muft Bijli Yojana. The central government provides a Direct Benefit Transfer (DBT) subsidy directly to your bank account:

State subsidy note: Assam offers an additional state subsidy of up to ₹15,000 per residential system installed under the Assam Rooftop Solar Policy, on top of central PM Surya Ghar.

Cost & Savings Table — Guwahati (2026)

System Size Gross Cost Subsidy Net Cost Annual Generation Monthly Savings Payback
1 kW ₹60,000 ₹30,000 ₹30,000 ~1,278 units ₹651/month 3.8 yrs
2 kW ₹120,000 ₹60,000 ₹60,000 ~2,555 units ₹1,302/month 3.8 yrs
3 kW ₹180,000 ₹78,000 ₹102,000 ~3,832 units ₹1,953/month 4.4 yrs
5 kW ₹300,000 ₹78,000 ₹222,000 ~6,388 units ₹3,255/month 5.7 yrs
10 kW ₹600,000 ₹78,000 ₹522,000 ~12,775 units ₹6,510/month 6.7 yrs

* Costs are indicative estimates for Guwahati as of 2026. Actual prices vary by brand (Waaree, Adani, Tata, Vikram). Savings calculated at ₹6.20/unit tariff. Use our cost calculator for personalised estimates.

Your DISCOM: APDCL

In Guwahati, electricity distribution and net metering for rooftop solar is managed by APDCL (Assam Power Distribution Company Ltd). Here's what you need to know about solar net metering under APDCL:

Step-by-Step: How to Get Solar in Guwahati

  1. Check your eligibility: Use our Subsidy Calculator to see the exact PM Surya Ghar amount for your home's load and Assam location.
  2. Size your system: Use the Panel Requirement Calculator — enter your monthly bill in units. Most Guwahati households need a 2–4 kW system.
  3. Register on the National Portal: Go to pmsuryaghar.gov.in, register with your Aadhaar and APDCL consumer number.
  4. Choose an MNRE-empanelled installer from the portal's vendor list — do not use non-empanelled vendors as your subsidy will be blocked.
  5. Get installation done: Typical completion time in Guwahati: 2–4 days for a residential system.
  6. Submit inspection documents to APDCL for net meter installation (usually within 15–30 days).
  7. Receive subsidy: DBT credit directly to your bank account within 30 days of net meter commissioning.

Solar ROI Analysis for Guwahati

Here's a quick back-of-envelope calculation for a typical Guwahati household:

Want the exact numbers for your home? Use our Solar ROI Calculator and Solar Loan EMI Calculator if you're considering financing.

Nearby Cities Also Exploring Solar

If you found this guide useful, also check our guides for nearby cities: Kolkata, Patna, Bhubaneswar — each with city-specific DISCOM, tariff, and cost data.

For state-level subsidy policy in Assam, see our Assam Solar Calculator.

Frequently Asked Questions — Solar in Guwahati

Which DISCOM handles solar in Guwahati?

APDCL handles all grid connections, net metering applications, and billing in Guwahati. Contact your nearest sub-division office or visit the DISCOM's official portal to apply for net metering after installation.

How many peak sun hours does Guwahati get per day?

Guwahati receives approximately 4.2 peak sun hours per day (annual average based on MNRE solar radiation data). This determines how much electricity your solar panels generate — every 1 kW of installed capacity generates roughly 1226 units per year.

How much does a 3kW solar system cost in Guwahati after subsidy?

A 3kW on-grid solar system in Guwahati typically costs ₹1.65–1.95 lakh gross. After the PM Surya Ghar central subsidy of ₹78,000, the effective cost is approximately ₹87,000–₹1.17 lakh. With 4.2 PSH/day, payback is around 4.4 years.

What is the PM Surya Ghar subsidy process in Guwahati?

1) Register at pmsuryaghar.gov.in with your APDCL consumer number and Aadhaar. 2) Get feasibility approval (7–15 days). 3) Install via MNRE-empaneled vendor. 4) APDCL installs bi-directional smart meter after inspection. 5) Subsidy of up to ₹78,000 credited to your bank account within 30 days of commissioning.

Ready to Go Solar in Guwahati?

Use our free calculators to get your personalised cost, subsidy and ROI estimate.

Calculate My Solar Cost →