Home › Solar in Mysore

Go Solar in Mysore

Your ultimate guide to switching to green energy in Mysore. Calculate your costs, understand local subsidies, and check your ROI.

☀️ 5.4 Peak Sun Hours/day 🏢 DISCOM: CESC Mysore 💰 Subsidy up to ₹78,000 ⚡ Payback: ~2.8 years

Top Tools for Mysore Residents

💰
Cost Calculator
Check Mysore market rates for 1kW - 10kW setups.
🎁
Subsidy Check
See your eligible PM Surya Ghar funds instantly.
📈
ROI Calculator
Discover your payback period in Mysore.

Solar Energy in Mysuru (Mysore): Complete 2026 Guide

Mysuru is Karnataka's second largest city and a tourism capital. CESC Mysore has been among India's earliest DISCOMs to set up a dedicated solar helpdesk for residential net metering applicants. With electricity tariffs charged by CESC Mysore at ₹7.40/unit and rising every year, switching to rooftop solar is now the single best financial decision a Mysuru (Mysore) household can make in 2026.

Solar Potential: How Much Can You Generate in Mysuru (Mysore)?

Mysuru (Mysore) receives approximately 5.4 peak sun hours per day (based on MNRE solar radiation data for this region). This means every 1 kW of rooftop solar installed here generates about 1,642 units of electricity per year.

For a typical 3 kW system — the most popular size for a 2–3 BHK home — you can expect:

PM Surya Ghar Subsidy for Mysuru (Mysore) Residents

Residents of Mysuru (Mysore) in Karnataka are fully eligible for the PM Surya Ghar Muft Bijli Yojana. The central government provides a Direct Benefit Transfer (DBT) subsidy directly to your bank account:

State subsidy note: No Karnataka state top-up. Central PM Surya Ghar applies.

Cost & Savings Table — Mysuru (Mysore) (2026)

System Size Gross Cost Subsidy Net Cost Annual Generation Monthly Savings Payback
1 kW ₹60,000 ₹30,000 ₹30,000 ~1,642 units ₹999/month 2.5 yrs
2 kW ₹120,000 ₹60,000 ₹60,000 ~3,285 units ₹1,998/month 2.5 yrs
3 kW ₹180,000 ₹78,000 ₹102,000 ~4,928 units ₹2,997/month 2.8 yrs
5 kW ₹300,000 ₹78,000 ₹222,000 ~8,212 units ₹4,995/month 3.7 yrs
10 kW ₹600,000 ₹78,000 ₹522,000 ~16,425 units ₹9,990/month 4.4 yrs

* Costs are indicative estimates for Mysuru (Mysore) as of 2026. Actual prices vary by brand (Waaree, Adani, Tata, Vikram). Savings calculated at ₹7.40/unit tariff. Use our cost calculator for personalised estimates.

Your DISCOM: CESC Mysore

In Mysuru (Mysore), electricity distribution and net metering for rooftop solar is managed by CESC Mysore (Chamundeshwari Electricity Supply Corporation). Here's what you need to know about solar net metering under CESC Mysore:

Step-by-Step: How to Get Solar in Mysuru (Mysore)

  1. Check your eligibility: Use our Subsidy Calculator to see the exact PM Surya Ghar amount for your home's load and Karnataka location.
  2. Size your system: Use the Panel Requirement Calculator — enter your monthly bill in units. Most Mysuru (Mysore) households need a 2–4 kW system.
  3. Register on the National Portal: Go to pmsuryaghar.gov.in, register with your Aadhaar and CESC Mysore consumer number.
  4. Choose an MNRE-empanelled installer from the portal's vendor list — do not use non-empanelled vendors as your subsidy will be blocked.
  5. Get installation done: Typical completion time in Mysuru (Mysore): 2–4 days for a residential system.
  6. Submit inspection documents to CESC Mysore for net meter installation (usually within 15–30 days).
  7. Receive subsidy: DBT credit directly to your bank account within 30 days of net meter commissioning.

Solar ROI Analysis for Mysuru (Mysore)

Here's a quick back-of-envelope calculation for a typical Mysuru (Mysore) household:

Want the exact numbers for your home? Use our Solar ROI Calculator and Solar Loan EMI Calculator if you're considering financing.

Nearby Cities Also Exploring Solar

If you found this guide useful, also check our guides for nearby cities: Bangalore, Mangalore, Hubli Dharwad — each with city-specific DISCOM, tariff, and cost data.

For state-level subsidy policy in Karnataka, see our Karnataka Solar Calculator.

Frequently Asked Questions — Solar in Mysore

Which DISCOM handles solar in Mysore?

CESC Mysore handles all grid connections, net metering applications, and billing in Mysore. Contact your nearest sub-division office or visit the DISCOM's official portal to apply for net metering after installation.

How many peak sun hours does Mysore get per day?

Mysore receives approximately 5.4 peak sun hours per day (annual average based on MNRE solar radiation data). This determines how much electricity your solar panels generate — every 1 kW of installed capacity generates roughly 1577 units per year.

How much does a 3kW solar system cost in Mysore after subsidy?

A 3kW on-grid solar system in Mysore typically costs ₹1.65–1.95 lakh gross. After the PM Surya Ghar central subsidy of ₹78,000, the effective cost is approximately ₹87,000–₹1.17 lakh. With 5.4 PSH/day, payback is around 2.8 years.

What is the PM Surya Ghar subsidy process in Mysore?

1) Register at pmsuryaghar.gov.in with your CESC Mysore consumer number and Aadhaar. 2) Get feasibility approval (7–15 days). 3) Install via MNRE-empaneled vendor. 4) CESC Mysore installs bi-directional smart meter after inspection. 5) Subsidy of up to ₹78,000 credited to your bank account within 30 days of commissioning.

Ready to Go Solar in Mysore?

Use our free calculators to get your personalised cost, subsidy and ROI estimate.

Calculate My Solar Cost →

Verified Solar Installers Near You

Top-rated solar companies ready to serve your area.