Home › Solar in Varanasi

Go Solar in Varanasi

Your ultimate guide to switching to green energy in Varanasi. Calculate your costs, understand local subsidies, and check your ROI.

☀️ 5.0 Peak Sun Hours/day 🏢 DISCOM: PUVVNL 💰 Subsidy up to ₹78,000 ⚡ Payback: ~3.5 years

Top Tools for Varanasi Residents

💰
Cost Calculator
Check Varanasi market rates for 1kW - 10kW setups.
🎁
Subsidy Check
See your eligible PM Surya Ghar funds instantly.
📈
ROI Calculator
Discover your payback period in Varanasi.

Solar Energy in Varanasi: Complete 2026 Guide

Varanasi, the spiritual capital of India, has installed solar at several ghats under the Smart City Mission. PM Modi's parliamentary constituency has been a showcase for solar India's push into tier-2 cities. With electricity tariffs charged by PUVVNL at ₹6.50/unit and rising every year, switching to rooftop solar is now the single best financial decision a Varanasi household can make in 2026.

Solar Potential: How Much Can You Generate in Varanasi?

Varanasi receives approximately 5.0 peak sun hours per day (based on MNRE solar radiation data for this region). This means every 1 kW of rooftop solar installed here generates about 1,533 units of electricity per year.

For a typical 3 kW system — the most popular size for a 2–3 BHK home — you can expect:

PM Surya Ghar Subsidy for Varanasi Residents

Residents of Varanasi in Uttar Pradesh are fully eligible for the PM Surya Ghar Muft Bijli Yojana. The central government provides a Direct Benefit Transfer (DBT) subsidy directly to your bank account:

State subsidy note: No UP state top-up. Central PM Surya Ghar applies.

Cost & Savings Table — Varanasi (2026)

System Size Gross Cost Subsidy Net Cost Annual Generation Monthly Savings Payback
1 kW ₹60,000 ₹30,000 ₹30,000 ~1,533 units ₹819/month 3.1 yrs
2 kW ₹120,000 ₹60,000 ₹60,000 ~3,066 units ₹1,638/month 3.1 yrs
3 kW ₹180,000 ₹78,000 ₹102,000 ~4,599 units ₹2,457/month 3.5 yrs
5 kW ₹300,000 ₹78,000 ₹222,000 ~7,665 units ₹4,095/month 4.5 yrs
10 kW ₹600,000 ₹78,000 ₹522,000 ~15,330 units ₹8,190/month 5.3 yrs

* Costs are indicative estimates for Varanasi as of 2026. Actual prices vary by brand (Waaree, Adani, Tata, Vikram). Savings calculated at ₹6.50/unit tariff. Use our cost calculator for personalised estimates.

Your DISCOM: PUVVNL

In Varanasi, electricity distribution and net metering for rooftop solar is managed by PUVVNL (Purvanchal Vidyut Vitaran Nigam Ltd). Here's what you need to know about solar net metering under PUVVNL:

Step-by-Step: How to Get Solar in Varanasi

  1. Check your eligibility: Use our Subsidy Calculator to see the exact PM Surya Ghar amount for your home's load and Uttar Pradesh location.
  2. Size your system: Use the Panel Requirement Calculator — enter your monthly bill in units. Most Varanasi households need a 2–4 kW system.
  3. Register on the National Portal: Go to pmsuryaghar.gov.in, register with your Aadhaar and PUVVNL consumer number.
  4. Choose an MNRE-empanelled installer from the portal's vendor list — do not use non-empanelled vendors as your subsidy will be blocked.
  5. Get installation done: Typical completion time in Varanasi: 2–4 days for a residential system.
  6. Submit inspection documents to PUVVNL for net meter installation (usually within 15–30 days).
  7. Receive subsidy: DBT credit directly to your bank account within 30 days of net meter commissioning.

Solar ROI Analysis for Varanasi

Here's a quick back-of-envelope calculation for a typical Varanasi household:

Want the exact numbers for your home? Use our Solar ROI Calculator and Solar Loan EMI Calculator if you're considering financing.

Nearby Cities Also Exploring Solar

If you found this guide useful, also check our guides for nearby cities: Allahabad, Kanpur, Patna — each with city-specific DISCOM, tariff, and cost data.

For state-level subsidy policy in Uttar Pradesh, see our Uttar Pradesh Solar Calculator.

Frequently Asked Questions — Solar in Varanasi

Which DISCOM handles solar in Varanasi?

PUVVNL handles all grid connections, net metering applications, and billing in Varanasi. Contact your nearest sub-division office or visit the DISCOM's official portal to apply for net metering after installation.

How many peak sun hours does Varanasi get per day?

Varanasi receives approximately 5.0 peak sun hours per day (annual average based on MNRE solar radiation data). This determines how much electricity your solar panels generate — every 1 kW of installed capacity generates roughly 1460 units per year.

How much does a 3kW solar system cost in Varanasi after subsidy?

A 3kW on-grid solar system in Varanasi typically costs ₹1.65–1.95 lakh gross. After the PM Surya Ghar central subsidy of ₹78,000, the effective cost is approximately ₹87,000–₹1.17 lakh. With 5.0 PSH/day, payback is around 3.5 years.

What is the PM Surya Ghar subsidy process in Varanasi?

1) Register at pmsuryaghar.gov.in with your PUVVNL consumer number and Aadhaar. 2) Get feasibility approval (7–15 days). 3) Install via MNRE-empaneled vendor. 4) PUVVNL installs bi-directional smart meter after inspection. 5) Subsidy of up to ₹78,000 credited to your bank account within 30 days of commissioning.

Ready to Go Solar in Varanasi?

Use our free calculators to get your personalised cost, subsidy and ROI estimate.

Calculate My Solar Cost →

Verified Solar Installers Near You

Top-rated solar companies ready to serve your area.