MNRE's Landmark Policy Enforcement for Indian Solar Manufacturing
In a major regulatory milestone for India's clean energy transition, the Ministry of New and Renewable Energy (MNRE) has officially operationalized ALMM List-II (Approved List of Models and Manufacturers for Solar PV Cells). While ALMM List-I certified domestic solar module assemblers, List-II extends compliance to the silicon solar cells used inside those modules.
This mandate ensures complete supply-chain independence, requiring that all government-subsidized rooftop solar projects under PM Surya Ghar Muft Bijli Yojana and government solar tenders utilize domestically produced solar cells.
30-Second News Summary
Key policy highlights of MNRE ALMM List-II enforcement
- Policy Enforcement Date: The Ministry of New and Renewable Energy (MNRE) officially enforces ALMM List-II starting October 2026, mandating that all government-subsidized rooftop solar projects (PM Surya Ghar) must use domestic silicon cells as well as modules.
- Cell Gigafactory Surge: India's domestic solar cell manufacturing capacity has expanded past 28GW, powered by N-Type TOPCon and Mono PERC lines across Gujarat, Tamil Nadu, and Odisha.
- Subsidy Protection: Homeowners must ensure their installers issue DCR (Domestic Content Requirement) certificates detailing ALMM List-II cell serial numbers to avoid PM Surya Ghar subsidy claim rejection.
- Module Pricing Stability: Increased domestic cell competition keeps certified DCR TOPCon modules priced affordably between ₹21 and ₹25 per Watt.
Domestic Cell Manufacturing Capacity Breakdown (India 2026)
| Manufacturer | Cell Technology | Annual Capacity (GW) | Manufacturing State |
|---|---|---|---|
| Waaree Energies | N-Type TOPCon & Mono PERC | 5.4 GW | Gujarat |
| Tata Power Solar | N-Type TOPCon & Bifacial | 4.3 GW | Tamil Nadu |
| Adani Solar (Mundra) | TOPCon & HJT Cells | 4.0 GW | Gujarat |
| Vikram Solar | N-Type TOPCon | 3.2 GW | Tamil Nadu / West Bengal |
| Premier Energies | TOPCon & Mono PERC | 3.0 GW | Telangana |
Impact on Homeowners & PM Surya Ghar Subsidy Clearance
- Mandatory DCR Verification: Installers must upload ALMM List-II certified cell serial numbers to the National Portal during work completion.
- Zero Delay in Subsidy Claims: Choosing List-II compliant modules ensures direct bank transfer of the ₹78,000 central subsidy within 30 days of net-metering synchronization.
⚡ Calculate Your 2026 Solar Savings & Subsidy
Select your monthly electricity bill to calculate the ideal system capacity, PM Surya Ghar subsidy, and lifetime savings:
📲 Join 25,000+ Solar Homeowners in India
Get instant answers on PM Surya Ghar subsidies, net-metering status, and installer quotes.