MESCOM Electricity Tariff Slabs 2026
The following domestic tariff slabs apply to household consumers under MESCOM (Mangalore Electricity Supply Company Limited). Commercial and industrial tariffs differ — check mescom.karnataka.gov.in for those categories.
| Monthly Consumption Slab | Rate per Unit (Indicative) |
|---|---|
| Domestic tariff (KERC statewide order) | similar to BESCOM's slabs — approx ₹3.15–8.80/unit depending on consumption |
MESCOM Solar Net Metering — Export Rate
Under net metering, MESCOM consumers with rooftop solar systems can export surplus electricity to the grid and receive credit. MESCOM follows the same KERC-set net metering export rate framework as BESCOM (~₹3.56/unit), since KERC issues one regulation applicable across all Karnataka DISCOMs.
Net metering settlement for MESCOM is monthly, per KERC regulations, as per KERC regulations.
How Solar Saves Money Under MESCOM Tariffs
For a household consuming 300–400 units per month in the MESCOM area, a 3 kW solar system can offset 300–360 units per month (25 kWh/day average). At current MESCOM tariffs, this can save a meaningful portion of the electricity bill each month, depending on which consumption slab your usage falls into and your generation profile.
Use our solar cost calculator and ROI calculator to estimate your exact savings based on your monthly bill.
PM Surya Ghar Subsidy for MESCOM Consumers
Residential consumers in MESCOM areas are eligible for PM Surya Ghar Muft Bijli Yojana subsidy: up to ₹78,000 central subsidy for a 3kW system. Check KERC/your state renewable energy agency for any additional state-level incentives on top of the central subsidy. To avail the subsidy:
- Apply at pmsuryaghar.gov.in
- Select an MNRE-empanelled installer from your DISCOM area
- Complete installation; installer files net metering application with MESCOM
- After DISCOM inspection and net meter installation, subsidy is credited to your bank account
Serving customers in Mangalore, Udupi, Chikmagalur, Kodagu, and surrounding coastal Karnataka districts.
🌟 Connect with Verified Solar Installers in Your City
Get 3 free quotes from MNRE-empanelled solar installers registered with MESCOM.
Get Free Solar Quotes →Documents for MESCOM Net Metering Application
- Last 3 months electricity bill (showing MESCOM consumer number)
- Load sanction / connection letter
- Solar system single-line diagram (SLD) — signed by licensed electrical engineer
- Inverter test certificate (IEC 61727 / IS 16221)
- Solar panel IEC certificate (IEC 61215, IEC 61730)
- MNRE-empanelled installer's electrical contractor licence copy
- GST invoice for solar system
- Geo-tagged site photographs
- ID proof of electricity consumer
See our complete DISCOM net metering documentation guide for the full state-wise checklist.
SolarCalculators