Calculate the complete cost to connect your rooftop solar to the grid — DISCOM application fees, meter charges, safety deposit, and net metering setup cost by state.
Connecting your rooftop solar system to the grid (Net Metering or Gross Metering) is a critical step that involves coordinating with your local Distribution Company (DISCOM). The process begins with an online application on the National Portal for Rooftop Solar or your respective state DISCOM portal. You will need to submit technical details of your proposed system along with standard documents like identity proofs and recent electricity bills.
Once the application is reviewed, the DISCOM conducts a technical feasibility study to ensure the local transformer can handle the extra load. Upon approval, you receive a feasibility clearance, after which your vendor can install the solar plant. Post-installation, the DISCOM inspects the setup, tests the inverter and grounding, and installs a bidirectional net meter. Only after this meter is sealed and a net metering agreement is signed can you legally turn on your solar system and start exporting power.
While the Ministry of New and Renewable Energy (MNRE) mandates swift approvals, real-world timelines vary by state. In progressive states like Gujarat (MGVCL, DGVCL) and Maharashtra (MSEDCL), the entire process from application to meter installation typically takes 15 to 30 days due to streamlined digital portals. In contrast, states with more complex bureaucratic structures may take 30 to 45 days. It's always best to follow up with your local sub-divisional officer (SDO) or Junior Engineer (JE) directly if applications are pending beyond two weeks.
To ensure a smooth application process, keep the following documents ready before applying:
You generally need your latest electricity bill, property tax receipt or index 2, identity proof (Aadhaar/PAN), and NOC from society (if applicable).
DISCOM approval typically takes 15 to 45 days in India, depending on the state and whether a local feasibility study is required.
No, in most states you must purchase the bidirectional net meter either directly from the DISCOM or an approved vendor. Costs range from ₹3,000 to ₹8,000.
Generally, grid connection charges are non-refundable application and setup fees. However, the safety deposit portion is usually refundable if you ever disconnect the system.